A flowline project entitled “A92 Oil well Connection
Project” was completed in
November 2007 well before
the expected completion date.
The project scope saw the installation
(fabrication, erection, testing and
pre-commissioning) of 1,300m of 8”
buried carbon steel piping and 130m of
8” above ground carbon steel piping
from a newly drilled wellhead to a tie in
point.
Included in the scope were
necessary civil works, such as installation
of anchor blocks, supports, bases, etc.
Due to the fast completion of this
project, LCM was awarded a similar
job – but this time covering 1400m
of 8” buried carbon steel piping.
This project started on 3rd Jan 2008 and
was also completed ahead of schedule.